2004 SPLOST 

 


Project: 20320 Anvilblock Road 

 

2004 project map3Widening and Reconstruction of Anvil Block Road from Grant Road to Allen Drive at the Clayton/Henry County line. The portion of Anvil Block Road from Grant Road to Bouldercrest Road (project length of 0.46 miles) will be a 4-lane facility with a raised concrete median. The portion of Anvil Block Road from Bouldercrest Road to Allen Drive (project length of 1.34 miles) will transition to a 3-lane facility with a center turn lane. The total length of project is 1.80 miles.

Project: 30483 AVIATION BLVD/CW GRANT PKWY/CR 1516 GRADE SEP @ NS RR; INC CONLEY RD & SR 3 RELOC

2004 project map4The proposed 4-lane facility will widen and grade separate C.W. Grant Parkway under Norfolk Southern Railroad and Old Dixie Highway. Also proposed is the widening and relocation of Conley Road and Old Dixie Road. The total length of project is 1.30 miles.

Project: 30600 BATTLE CREEK RD WIDENING FROM VALLEY HILL RD TO SOUTHLAKE PARKWAY (GDOT PI# 751775-)

2004 project map5Project consists of the widening and reconstruction of Battle Creek Road (CR 1342) from Valley Hill Rd to Southlake Pkwy for approximately 2.11 miles. This project will widen Battle Creek Road from the existing two lane facility to four lanes with a 20-foot wide raised median and an urban shoulder consisting of curb and gutter, 6-foot wide grass strip and 5- foot wide sidewalks.

Project: 26820-02 BATTLE CREEK RD/MT. ZION BLVD WIDENING FROM SOUTHLAKE PARKWAY TO SOMERTON DRIVE (GDOT PI# 751770-)

2004 project map6This project consists of widening Battle Creek Rd (CR 1342) and Mt. Zion Blvd (CR 28) from Southlake Pkwy to Somerton Dr. The existing two and four lane facilities will be widened to four 11-foot wide lanes with a 20-foot wide raised median with urban shoulders consisting of 2.5-foot wide curb and gutter, 2-foot wide grass strip and 5-foot-wide sidewalks.

Project: 31730 CLARK HOWELL HIGHWAY REALIGNMENT

 

2004 project map7The proposed 4-lane facility will relocate a portion of Clark Howell Highway from Forest Parkway just east of the Flint River to Terrell Mill Road and will realign a portion of Forest Parkway from the Flint River Bridge to SR 85. The total length of the project is 1.08 miles.

Project: 33330-02 FLINT RIVER RD 3-LANE WIDENING FROM GLENWOODS DRIVE TO KENDRICK ROAD (GDOT PI # 751810)

2004 project map8Widening and Reconstruction of Flint River Road from a 2-lane roadway to a 3-lane facility with a continuous center turn lane beginning at Glenwoods Drive and ending east of Kendrick Road for a total project length of 1.13 miles.

Project: 33650 GODBY ROAD WIDENING AND RECONSTRUCTION FROM SOUTHAMPTON ROAD TO SR 314/WEST FAYETTEVILLE ROAD

2004 project map9Widening and Reconstruction of Godby Road from a 2-lane roadway to a 4-lane facility with a raised concrete median beginning at the Fulton/Clayton County Line and ending just east of the intersection of Godby Road and SR 314/West Fayetteville Road for a total project length of 0.68 miles.

Project: 26820-01 MT. ZION BLVD. IMPROVEMENTS 3-LANE (SOMERTON DR TO REX RD)

2004 project map10Widening and Reconstruction of Mt. Zion Boulevard from a 2-lane roadway to a 3-lane facility with a center turn lane beginning at Somerton Drive and ending at Rex Road for a total project length of 0.62 miles.

Project: 36330 NORMAN DRIVE 3-LANE IMPROVEMENT FROM SR 314/WEST FAYETTEVILLE RD TO SR 139/RIVERDALE RD

2004 project map11Widening and Reconstruction of Norman Drive from a 2-lane roadway to a 3-lane facility with a center turn lane beginning at SR 314/W. Fayetteville Road and ending at SR 139/Riverdale Road for a total project length of 0.68 miles.

Project: 27860 PANOLA ROAD WIDENING (BOULDERCREST RD TO COUNTY LINE)

2004 project map124-Lane Widening.

Project: 8C099-04 T&D UNDESIGNATED FUNDS FOR PROJECTS

 

Holding account for 2004 SPLOST undesignated revenues.

 

2009 SPLOST 


 

Project: 10000-16LMIG 2016 LMIG PROGRAM

 

Work will consist of pavement milling and patching; Overlaying the existing pavement and replacement of existing pavement markings; Replacement of damaged concrete curb and gutter sidewalk, along with removal and replacement of substandard Americans with Disabilities Act (ADA) ramps and sidewalk sections on various roads.

Project: BR006 BROWN ROAD BRIDGE - REPAIR

 

2009 project map15Emergency Repair to Brown Road Bridge over Swamp Creek.

Project: 2009-BR BROWN ROAD BRIDGE REPLACEMENT

 

2009 project map15Replacement of the Brown Road Bridge over Swamp Creek.

Project: 26860 MT. ZION PRIMARY SCHOOL PROJECT

 

2009 project map16Adding a left turn lane at the Primary School and extending sidewalk to Fielder Rd.

Project: 56900 MUNDYS MILL CULVERT EXTENSION/ SHOULDER IMPROVEMENT

 

2009 project map17The Project will consist of extending the existing triple barrel (10’ x 8’) concrete box culvert for Swamp Creek to improve the roadside safety of Mundys Mill Rd. The roadway shoulders and embankment slopes will be widened to the extent of the clear zone as defined by AASHTO.

Project: 57500 PANHANDLE RD @ EDDIE WHITE ACADEMY

 

2009 project map18Adding a turn lane.

Project: 57500-1 PANHANDLE RD SIDEWALK

 

2009 project map19The Project will consist of constructing a 5 -foot wide concrete sidewalk along both sides of Panhandle Road from the intersection of McDonough Road (SR 920) to the intersection of Tara Road in areas without existing sidewalk. The project will include installing new Americans with Disabilities Act (ADA) compliant ramps and upgrading existing ramps that are not ADA compliant, construction of concrete curb and gutter at various locations, pavement markings, roadway signage, and storm drain improvements. Existing sidewalks in need of repair will also be replaced.

Project: 29585 SR 138 RIGHT-TURN LANE CONSTRUCTION AT LAKE RIDGE PARKWAY

 

2009 project map20Construction of a 12-foot wide auxiliary (right-turn) lane along the southern side of State Route (SR) 138 between Shannon Oak Drive and Lake Ridge Parkway. In addition, a five (5) foot wide concrete sidewalk parallel to the auxiliary lane on the southern side of SR 138 will be added.

Project: 39100 TARA BLVD SIDEWALK-SUMMERWIND DRIVE TO FLINT TRAIL

 

Construction of a 6-foot wide concrete sidewalk along the west side of the roadway of Tara Boulevard in areas without existing sidewalk. Installing new Americans with Disabilities Act (ADA) compliant ramps and upgrading existing ramps which are not ADA compliant. Construction of concrete curb and gutter at various locations, pavement markings, roadway signage, and storm drain improvements. Existing sidewalk, and curb and gutter in need of repair will also be replaced.

Project: BR007 VALLEY HILL RD BRIDGE

 

2009 project map21Bridge Replacement

 

2015 SPLOST 


 

Project: 2015-CTP COMPREHENSIVE TRANSPORTATION PLAN (CTP) UPDATE

 

The Comprehensive Transportation Plan (CTP) Program - The area of study for the plan development is defined, but not limited to, the Clayton County jurisdictional boundary, including the municipalities. Coordination with adjacent jurisdictions within an area three to five miles outside Clayton County is also required in order to promote coordinated long-range transportation planning efforts across jurisdictional boundaries. The CTP will provide financial assistance for counties and their constituent municipalities to develop joint long-range transportation plans. These plans, while focused on local issues and needs, also serve as the foundation for regional planning efforts led by the Atlanta Regional Commission (ARC).

Project: 2015-10 TRANSPORTATION & DEVELOPMENT PROJECTS-ROADS & SIDEWALKS

 

Transportation funding will be utilized for several different initiatives and program areas including roadway maintenance and resurfacing, traffic signals, signing and traffic operations, bridge/culvert repairs and replacements, safety improvements, sidewalk installation, and landscaping/roadway lighting.